Collaborative Project with CERN

DYNAMICAL 3D MODELING OF INSTALLATION
Project Responsible:
from CERN:  Marzio Nessi
ATLAS Technical Coordination chief manager
from Center: Alexander Sharmazanashvili
Engineering center chief manager


Information about Report



Purpose of this activity is verification of installation procedures and detection of dynamical clashes/clearances during the movement of assembly to be installed. Finally, after consideration of all bottlenecks of installation, exact path of movement has to be defined. Results are documented into descriptive report (.pdf file) and in technical movies (.avi file) with dynamical illustrations of all possible conflicts during the movement

END_CAP_TOROID INSTALLATION DYNAMICAL MODELING - Side A (weight = 280 tones, length = 12 meters, width = 5 meters) 12/05/2007

 
 

JD DISK INSTALLATION DYNAMICAL MODELING
Side C (weight = 140 tones, length = 10 meters, width = 2 meters) 16/12/2007